Henley Road, Leicester – 3/4″ gas service pipe replacement

gas-service-pipe-replacement
Cadent Gas/TRIIO undertaking trials with trenchless Kobus Pipe Puller to replace gas service pipe

Description
Cadent Gas/tRiiO approached KOBUS Services to run a trial using the KOBUS KPP400 Pipe Puller in Leicester on a particularly awkward gas service pipe replacement.  The property had a newly laid, and expensive driveway/pathway, which would be expensive and time consuming to reinstate.  There were also drains running across the path of the pipe to be replaced, and power cables in close proximity, which made moling difficult.

The pipe being replaced was galvanised steel, ¾” and it was a short side replacement from the pavement outside the property.  Length of pipe was 15m.  Soil was clay.

Outcomes
The gas service pipe replacement was completed in just over 1 hour including the preparation of the Pipe Puller onto the mini excavator, and excavation of a small hole to the rear where the service pipe entered the property.  The extraction of the old pipe and replacement with new, took 5 minutes.

The work was undertaken under standard Cadent Gas/tRiiO health & safety procedures. There were no reported incidents in respect of either service strikes (HSG47) or operator activity.

To watch videos of the Kobus Pipe Puller KPP400 in action – go to our Video Gallery