One Out, Two Towed In.

July 7th, 2020 Kobus is in Trenton NJ, training crews from Spiniello Companies on their new KPP400.
There is a Paradox you all have heard about; what happens when the unstoppable force (UF) meets the unmovable object (UO)?
Today we found the answer. A 3/4” galvanized water service in extremely dry solid clay (UO) met our KPP400 Pipe Puller (UF) coupled with our 14mm Kobus Pulling Cable. Result? Knock out within the first 5 seconds of the first round.
Further, we performed a single pull twin insertion; this means we pulled only one of the two services out but towed in 2×3/4” copper pipes for both dwellings! It took some “out of the box” thinking but we did it. Later on we pulled out a 1” galvanized and towed in a 1” and a 3/4” copper pipes together. Awesome technology, awesome people.